post https://{hostname}/api/v1/scheduling/workload_generator/apply_update
This operation generates a workload from a staffing matrix and according to a date range and three Boolean indicators. The Boolean indicators determine which plan types to consider when generating the workload: budgeted volumes, planned volumes, and actual volumes. At least one of these three Boolean indicators must be true
.